Before you start: consumable definitions, fleet consumable setup and the quick-entry columns need to be set up. See Set Up Daily Service. You need the Daily Service Review permission.
Overview
Each service entry can have any number of consumable lines: fuel, oil, coolant and so on. A line records the quantity put in the vehicle, what it cost, and whether it was a shop issue. You can enter consumables two ways on the same page:
- In the row, in a quick-entry box, for the consumables your agency chose as quick-entry columns. Fastest for the everyday fuel and oil.
- In Edit Consumables, for anything else and for the full detail: unit cost, extended cost, shop issue and the GL Preview.
Consumable lines from the Fuel Island Import behave exactly like lines you key in. You can correct them the same way.
Enter quantities in the row
The grid has one quantity box for each column set up in Daily Service Settings, up to 10, in column order. The boxes appear in the row when you open it to edit.
1. Click the vehicle's row to edit it in place.
2. Type the quantity in the consumable's box.
3. Press Enter or click Save to save the row.
Typing a quantity creates that consumable line on the row. Changing it updates the line. Clearing it removes a plain line. It doesn't remove a line that came from the Fuel Island Import, a Shop Issue line, or a line with its own cost: change those in Edit Consumables. The line's cost is worked out for you: see How the cost is worked out.
Edit Consumables
Select the + at the left of a row to expand it, then Edit Consumables. Or right-click the row and choose Edit Consumables. On a posted entry the window is read-only.
The window lists every line on the entry. Each line shows:
| Field | What it is |
|---|---|
| Consumable | What was issued, for example Diesel. |
| Qty | The quantity as it was entered, in the meter's unit. A converted quantity is shown too: the quantity in the unit it's issued from inventory in. If the two units are the same, it's the same number. |
| Unit cost | The cost of one unit: the part's average cost when the line is saved. See How the cost is worked out. |
| Extended cost | Unit cost times the converted quantity, rounded to the cent. |
| Shop | Selected for a line that is issued to a work order instead of to the vehicle's running costs. See Shop Issue. |
| GL Preview | The debit and credit the line will post. See The GL Preview. |
| Messages | Errors and warnings on the line. |
To add a line, select Add Consumable, choose the consumable, type the quantity and press Enter or click Save.
Each line shows the debit and credit it will post. A missing or invalid account shows here first, and stops Update until the fleet's consumable setup is fixed.
Use Edit to change a line and Remove to take one off. Each add, change or remove saves on its own.
How the cost is worked out
The unit cost on a line comes from the first of these that applies:
- The cost already on the line. Lines from the fuel island import arrive with the cost the fuel island recorded.
- The part's average cost, when the fleet consumable setup for the vehicle's fleet names an inventory part for this consumable.
- The unit cost on the consumable definition.
A Shop Issue line always has a cost of 0.
Extended cost is the unit cost times the converted quantity, rounded to the cent. Print, Update and Recalculate all use the cost saved on each line.
Shop Issue
Select Shop on a line when the consumable isn't a running cost of the vehicle: it belongs with a work order. A Shop Issue line has no cost, and posting leaves it out of consumable usage history, inventory and the general ledger. The vehicle's miles and hours on that entry still post.
Shop Issue is set on each line, not on the whole row. A row can have fuel lines and a Shop Issue line together.
Errors and warnings on consumables
Errors block the row. The row shows what's wrong, and the day can't be posted until it's fixed:
- The consumable or product isn't defined.
- There is no fleet consumable setup for the vehicle's fleet, consumable and product. The grid then offers a link to open the fleet.
- The consumable's meter unit and issue unit differ and there is no unit conversion between them.
- General ledger posting is on for your agency and the fleet consumable setup has a missing or invalid debit or credit account for this consumable. This error only appears for agencies that use the general ledger.
Warnings don't block. The row saves and can be posted:
- Miles per unit or hours per unit is outside the range set on the fleet consumable setup. For example, a bus that appears to get far fewer miles per gallon than its normal range.
- The quantity is over the high usage limit on the fleet consumable setup.
- The quantity is more than is on hand in inventory. Posting does stop if the part's on-hand quantity would go below zero: see Post the Day with Update and Print.
The GL Preview
When your agency uses the general ledger, each line in Edit Consumables shows its GL Preview: the debit and credit the line will post when the day is posted. Each shows the division, account, account title and amount, and the preview reads Balanced when the debit and credit match. A missing or invalid account shows here first, and stops Update until the fleet's consumable setup is fixed.
The accounts come from the fleet consumable setup for the vehicle's fleet and the consumable. A Shop Issue line, a line with no cost, and any line when your agency has no general ledger posting, shows a note instead of a preview.
Check the totals
Select Totals above the grid to open Daily Service Totals for the date you chose. It works on posted and unposted days alike, and adds up the day's consumables so you can compare them with what your pumps and tanks say was used. Use it before Update to catch a missed or mistyped entry.
At the top, for the consumable chosen in the list below:
- Vehicle usage: the sum of the converted quantity on all entries.
- Pump usage and Tank usage: what the pump and tank readings for that date say was used. They are blank when there are no readings. They come from Tank and Pump Meter Entry.
- Vehicles serviced: how many different vehicles have an entry with that consumable.
Below that is one row per consumable: Vehicles, Vehicle usage, Pump, Tank and Difference (vehicle usage less pump usage). Select a consumable to list its lines underneath: Vehicle, Time, Qty, Cost, Shop and Posted. Posted and unposted entries both count.
Update checks the same thing. For a metered fuel, Update is refused while the pump total doesn't match the vehicles' total for that day. Any difference stops Update, so find it before you post: check the pump readings, or look for a missing or mistyped entry. A Difference of 0 here is a guide, not a promise that Update will pass. Tank usage is shown for comparison only: Update doesn't check it. See Post the Day with Update and Print.
Common questions
The extended cost is 0. The line is a Shop Issue, or no cost could be found (no cost on the line, no part cost, and a unit cost of 0 on the definition).
The quantity I typed changed. The row shows the quantity as you entered it; Edit Consumables also shows the converted quantity.
A consumable I need has no column. Use Edit Consumables to add a line, or ask someone with the Setup permission to add a column.
The GL Preview shows a note. Your agency has no general ledger posting set up, or the line is a Shop Issue or has no cost, or its accounts are missing.
Pump usage is blank. No pump reading has been entered for that date.